pretty much finished up all of the fabrication work on the front end (large front tubs, cleared out upper frame rail, and soon to be tube lower rad support).
I got two motors that week to build my 1 hybrid motor (1.5jz)
heres what happened
got my 1jz motor delivered from ebay
got it apart
got a 2jz locally
pulled the head
cleaned the 1jz head
1.5jz
where i left it
still need a bunch of motor parts, intercooler&radiator, ecu. tons of stuff